Description: Locations  Locations

Description: Email  Email

 

Select the search type
 
  • Site
  • Web

 
New Era® Rod Guides (Rotating)

Spin-Thru™ & Spin-Thru II™

  • Unique spin-thru design reduces hydraulic resistance and mechanical friction, so primary drives operate more efficiently and with less power
  • Patented guide fin design provides less pressure drop
  • Ultra-high molecular weight polyethylene (UHMW PE) guide for extremely durable construction
  • Scalloped ends prevent sand or other debris from accumulating in the bearing cavity and provide superior lubrication with fluid and cooling of guide and sleeve
  • Lower torque means less power required to operate the PC pump drive
  • Nominal tubing sizes:
    Spin-Thru: 2", 2-1/2", 3", 4-1/2", 5-1/2"
    Spin-Thru II: 2-1/2", 3"
  • Materials available:
    Guide: UHMW PE
    Sleeve: PPS, AF

 

Pathfinder™

  • A four-channeled inside sleeve that is bonded to the rod and rotates with the rod string

  • Handles temperatures to 180°F

  • The flow-thru rod guide design allows fluid to flow freely through the rod guide and reduces pressure drop

  • The stationary outside sleeve of the rod guide centralizes the rods inside the tubing to reduce wear

  • A combination of extra material added to offset channels and our proprietary SanGard material increase guide life over conventional rotating rod guides

  • Fits rod sizes from 5/8" to 1" and tubing sizes from 2-7/8" to 3-1/2"



New Era® Blazer™

  • Effectively increases production and decreases workover costs by extending rod and tubing service life in standard and high temperature applications

  • Specifically designed for wells using a downhole PCP

  • The spin-thru design reduces the torque that is generated by the mechanical and hydraulic friction of the rotating rod string

  • Compatible with SAGD and steam flooded applications

 
Docs & Resources Docs & Resources

New Era® Rod Guides

TNT 360™

 

 Field-Inst. Stealth XL™

 

 Condor-S™

 

 Material Selection Guide

 

 Tubing Wear
Prevention Solutions

Contact Us

888-355-5508

Corporate Headquarters
10586 Highway 75 N
Willis, Texas 77378
Phone: 936-890-1064
Fax: 936-890-9595

T3 Energy Services HQ
140 Cypress Station Dr, Suite 225
Houston, Texas 77090
Phone: 713-996-4110
Fax: 281-943-2042 (sales)
Fax: 713-375-3053 (hr)

Need Local Help?

Technical Bulletins Maximize

 

Featured

BOP 6012 Ram  The T3 Model 6012 is a ram type blowout preventer suitable for surface drilling and well intervention...
Safe Clamp Closure  With over 60 years of reliable field service, Yale® quick open closures are the industry leader.

Quick Contact

Name 
Email
Subject
Message  

Robbins & Myers

   
 
Copyright 2011 by Robbins & Myers