Description: Locations  Locations

Description: Email  Email

 

Select the search type
 
  • Site
  • Web

 
Thru Diverter System (TDS-2) Minimize

Similar to the Thru Diverter System, T3 TDS-2 is intended to reduce Rig time safely, therefore lowering customer's drilling costs.

  • Cementing operations can start immediately because the T3 TDS-s casing head is run through the diverter on the surface casing
  • Operations can continue with removal of the diverter and installation of the BOP riser for drilling out of the production casing

Using the TDS-2 the diverter is overshot & riser lowered over the conductor and rubber seals between the test port, with an optional ball valve for drainage. The landing joint and TDS casing head running tool are together and move with the rig.


Features

  • TDS casing head & casing string are landed thru the diverter on the casing support ring

  • Casing head outlet plugs can be removed

  • TDS BOP riser adapter installed to the stack and remains, moving with the rig

  • Standard T3 combination BOP test plug and wear bushing running and retrieval tool used

  • No third party rentals tools required

  • The threaded flange allows optionally for a 11” 5k or 3k bottom on the tubing head

Contact Us Minimize

888-355-5508

Corporate Headquarters
10586 Highway 75 N
Willis, Texas 77378
Phone: 936-890-1064
Fax: 936-890-9595

T3 Energy Services HQ
140 Cypress Station Dr, Suite 225
Houston, Texas 77090
Phone: 713-996-4110
Fax: 281-943-2042 (sales)
Fax: 713-375-3053 (hr)
Related Documents Minimize

 

Featured

BOP 6012 Ram  The T3 Model 6012 is a ram type blowout preventer suitable for surface drilling and well intervention...
Safe Clamp Closure  With over 60 years of reliable field service, Yale® quick open closures are the industry leader.

Quick Contact

Name 
Email
Subject
Message  

Robbins & Myers

   
 
Copyright 2011 by Robbins & Myers