The T3 Thru Diverter System (TDS-1) Wellhead safely reduces rig time and lowers drilling costs.
Ø Minimum 24 hours of rig time saved per well
Ø Does not require field welding for a completion
Ø No wait for cementing operations
Cementing operations can start immediately because the T3 TDS casing head is run through the diverter on the surface casing. Operations can continue with removal of the diverter and installation of the BOP riser for drilling out of the production casing.
T3 TDS-1 Wellhead:
Ø Compliant with API 6A PSL 1-3, PR2
Ø T3 Frac Isolation System compatible
Ø Standard T3 API 6A tubing heads, tubing hangers, and Christmas tree compatible